Facts & timeline
What is at stake.
Everything on this page is sourced. Where facts are uncertain, we say so.
1968
Opened — brutalist design by G. Wiljouw (Groosman N.V.)
460
Student rooms on the upper floors
~200
Makers in 70+ studios (Urban Resort)
24h
Radion’s licence, since 2015
~6,000
m² of broedplaats space
2027
End of the current temporary-use agreement
Timeline
- 1968
The building opens at Louwesweg 1, Amsterdam, a brutalist block designed by G. Wiljouw of E.F. Groosman N.V. (Rotterdam).
- 1984
ACTA — the Academic Centre for Dentistry Amsterdam (UvA/VU) — moves in.
- 2010
ACTA moves to the Zuidas. Housing corporation de Alliantie buys the building, intending to demolish it and build housing. The crisis makes that unfeasible.
- 2012
Temporary transformation: 460 student rooms on the upper floors, a broedplaats run by Urban Resort on the lower floors. Planned demolition dates (2020, 2023) come and go.
- 2014
Radion opens. In 2015 it receives a 24-hour licence — one of very few in the city.
- 2024
The broedplaats agreement with de Alliantie is extended by 3 years and 4 months, to the end of 2027. The city’s broedplaats policy names ACTA one of three XL broedplaatsen.
- 2026
The new city government (PRO & D66) calls space for makers a “public precondition” and promises clubs a place in new developments.
- Oct 2026
A city planning list (Gemeenteblad 2026, 484436) schedules “Sloterstrip | ACTA: 900 woningen” for construction from June 2029 to November 2032.
- 31.12.2027
The current broedplaats agreement ends. The planning decision for Sloterstrip is expected around this time — which is why we act now.
- 2029
Planned start of construction of 900 homes on the ACTA site — unless ACTA is kept in the plan.
Where things stand
The city has scheduled 900 homes on the ACTA site (2029–2032), but no demolition decision, permit or zoning change has been published yet. The current zoning does not even allow regular housing here — so a new planning decision is needed, and that is where residents, makers and the public get a say. Precedents like OT301 and Bajesdorp were saved because people organised before the decisions were made; De School and Marktkantine were lost when protest started only at the end of the lease. We are early. Let’s keep it that way.
Nitrogen
Demolition needs a permit nobody has yet.
Not a tax — a permit requirement. Since 2022, the nitrogen emitted while demolishing and building counts again, project by project. For 900 homes on the ACTA site that makes the 2029 start date far from certain.
- 2 Nov 2022
The Raad van State strikes down the “building exemption” (Porthos ruling, ECLI:NL:RVS:2022:3159). Nitrogen from the demolition and construction phase must be assessed again for every project.
- 18 Dec 2024
Offsetting new emissions against a site’s current use (“intern salderen”) now counts as a mitigating measure: it requires an appropriate assessment and a nature permit (ECLI:NL:RVS:2024:4923).
- 14 Jan 2026
Pasgeld-West ruling (ECLI:NL:RVS:2026:193): the same applies to zoning plans. The ACTA site needs exactly such a plan change, because the current zoning does not allow regular housing.
- 26 Jun 2026
The cabinet promises a minimum threshold “as soon as possible”, so projects with very little nitrogen deposition no longer need a permit. It is not in force yet.
Our ask: keep ACTA in use until the demolition, building and nature permits are final. Students, makers and Radion should not make way for an empty lot waiting on permits. And publish the nitrogen (AERIUS) calculation for the Sloterstrip plan.
We do not claim how much nitrogen the plan would deposit or on which nature areas — that requires the city’s own AERIUS calculation.
Sources
- Raad van State — Porthos final ruling (refers to the 2 Nov 2022 interim ruling on the building exemption) ↗
- BIJ12 — intern salderen (rulings of 18 Dec 2024 and 14 Jan 2026) ↗
- Rijksoverheid — cabinet nitrogen package, 26 June 2026 (minimum threshold) ↗
- Gemeente Amsterdam — Atelier- en Broedplaatsenbeleid 2023–2026 ↗
- Gemeente Amsterdam — Uitvoeringsagenda Nachtcultuur 2023–2026 ↗
- Coalitieakkoord Amsterdam 2026–2030 (PRO & D66) ↗
- Urban Resort — Jaarverslag 2023 ↗
- Urban Resort — ACTA ↗
- RVO — transformation case ACTA-gebouw (de Alliantie) ↗
- Kences — Landelijke Monitor Studentenhuisvesting 2025 ↗
- Kences — fewer student rooms in the big cities ↗
- Atlas Research — Broedplaatsen in de Metropoolregio Amsterdam (2022) ↗
- Atlas Research — De waarde van de kleine uurtjes (nachtcultuur, 2021) ↗
- NIBE / Dutch Green Building Council — embodied carbon new build vs renovation ↗
- Bestemmingsplan Park Haagseweg e.o. (NL.IMRO.0363.F1201BPSTD-VG01, 2013) ↗
- Gemeenteblad 2026, 484436 — netcongestie priority list (Sloterstrip | ACTA) ↗
- Gemeenteblad 2026, 364761 — Radion exploitatievergunning (24 hours) ↗
- Mixmag — clubs that stay open all weekend (Radion 24h licence) ↗
- Wikipedia — Louwesweg 1 ↗